Building Permit Details
Permit Number:
23-09448
Permit Status:
Completed
Permit Type:
Building
Project Type:
Residential
Description of Work:
RS - Residential
Scope of Work:
Alteration
Issued Date:
09/07/2023
CO Issue Date:
Plans Examiner:
Anthony Petty
Job Address:
1497 FLINTWOOD RD FRANKTOWN, CO 80116
Building Code:
2021 IRC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Final Building
10/30/2023
Disapproved
Rick Chadwick
1. Minimum grippable handrail height 34” 2. Caulk all water closet to floor 3. Complete shower inclosure 4. Tempered glazing at window required within 5’ of waters edge at tubs and showers 5. Maximum hot water temperature at tubs and showers 120* 6. Painting at lower rooms vould not check egress
Print Report
Final Building
12/18/2023
Approved
Rick Chadwick
Existing basement bedrooms do not meet egress at windows OK TO PROCEED
Print Report
Final Electric
10/30/2023
Disapproved
Thomas Buzo
Not ready. Courtesy walk only.
This permit is under new 2023NEC requirements. See 210.8 for GFCI protection requirements of Appliances and receptacles.
1)Areas that have been remodel - TR receptacles are required.
2)Spark rings req at kitchen back splash or install boxes flush to finish materials.
3)Receptacles under sink req GFCI and AFCI Protection.
4)Protect DW cord where it passes through cabinet.
5)Install Faceplate throughout project for scope of work.
6)Breaker lock req for hardwire appliances. 422
7)GFCI protection req for 120V -240V receptacles and Appliances as req per 210.8
8)AFCI protection req for all new and modified circuits. 210.12
9)Install all Smoke and CO Detectors as req per 314&315 IRC
Print Report
Final Electric
12/18/2023
Disapproved
Justin Lett
1. DW cord requires bushing 2. Both receps above micro require GFCI/AFCI protection 3. AFCI protection for disposal and device required to be TR type 4. Lower dryer requires GFCI protection 5. Plates missing lower laundry 6. Complete smokes/COs lower level-all must interconnect throughout house and will test at next inspection 7. Upper coffee bar AFCI protection required at breaker-new circuit 8. AFCI protection required craft room lights/receps, kitchen counter right of sink, kitchen lighting
Print Report
Final Electric
12/20/2023
Disapproved
Justin Lett
Corrections incomplete—2. Lighting recep above micro require GFCI protection 5. Plate missing lower laundry dryer
Print Report
Final Electric
12/21/2023
Approved
Justin Lett
Print Report
Interior Gas Line
09/08/2023
Disapproved
Rick Chadwick
Complete gas line
Print Report
Interior Gas Line
09/12/2023
Approved
Rick Chadwick
Print Report
Rough Electric
09/08/2023
Disapproved
Justin Lett
2023 NEC-1. Countertop spacing incorrect both sides of sink and at north end of kitchen counter 2. Provide installation instructions for double oven-typically requires 40A minimum branch circuit 3. Correct wall space at dining room wall 4. Nook counter recep required on 20A ckt and 2-4’ spacing 5. Walls at both sides of master bed door are greater than 24” and require receptacles 6. Exhaust fans not wired 7. Smoke alarms required in each bedroom, adjacent to each bedroom, every level. All require commercial power, battery back up, fully interconnected. Battery only alarms not permitted.
Notes for final-check new bathroom HR, lower laundry AFCI/GFCI breakers.
Basement mech sub lacks clearances-existing, non conforming condition
Note-island receps can no longer be located below island counter top and provisions are required to add them.
Print Report
Rough Electric
09/12/2023
Disapproved
Justin Lett
2023 NEC- 4. Nook counter recep required on 20A ckt and 2-4’ spacing 6. Exhaust fans not wired 7. Smoke alarms required in each bedroom, adjacent to each bedroom, every level. All require commercial power, battery back up, fully interconnected. Battery only alarms not permitted.
Print Report
Rough Electric
09/14/2023
Disapproved
Justin Lett
Corrections still outstanding-6. Exhaust fans not wired 7. Smoke alarms required in each bedroom, adjacent to each bedroom, every level. All require commercial power, battery back up, fully interconnected. Battery only alarms not permitted.
**Ok to continue insulating/drywall pending frame approval**
Print Report
Rough Electric
10/11/2023
Disapproved
Justin Lett
Corrections from previous incomplete
Print Report
Rough Electric
10/24/2023
Disapproved
Justin Lett
1. Smoke alarms required to be placed minimum of 36” horizontally from bathroom doors that contain tub/shower-R314 2. Exhaust fans require NM connectors at cable entry
Print Report
Rough Electric
10/30/2023
Approved
Thomas Buzo
Corrections Made
Print Report
Rough Frame
09/08/2023
Disapproved
Rick Chadwick
1. Provide min 1/4” plf fall at kitchen trap arm 2. Solid blocking between header members and face nail 3. Complete rough plumbing
Print Report
Rough Frame
09/12/2023
Disapproved
Rick Chadwick
1. Provide 1;4” plf fall at tub and shower 2. Provide engineering fix for DWV bore mid span within 2” of bottom of joist 3. Overspan at DWV at basement exterior wall 4. Stud shoe at upper level shower vent overbore 5. Foam DWV penetrations at exterior wall upper bathroom 6. Complete add on to permit for remodel of upper mid bathroom 6. Block and face nail header to garage
Print Report
Rough Frame
09/14/2023
Disapproved
Fredrick Mooney
Partial: previous items complete with the exception of:
2. Once added bathroom is updated to permit recall for visual inspection on modified plumbing.
3. Need to verify air gap at large shower overhead shower head supply to unconditioned space. 5 side encapsulation required.
4. Need to verify face nail of header at garage door header.
Print Report
Rough Frame
10/11/2023
Approved
Rick Chadwick
Print Report
Rough Plumbing
09/19/2023
Disapproved
Rick Chadwick
1. S trap at new shower location 2. Foam all penetrations
Print Report
Rough Plumbing
09/22/2023
Approved
Rick Chadwick
Print Report
Shower Pan
09/29/2023
Approved
Fredrick Mooney
There are 2 Shower Pans to be inspected.
Print Report