Building Permit Details
Permit Number: 24-07644
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 08/20/2024
CO Issue Date: 04/15/2025
Plans Examiner: Stuart Foster
Job Address: 10906 SHADOW PINES RD PARKER, CO 80138
Building Code: 2021 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 11/25/2024
Steel Letter 11/25/2024
Survey 11/25/2024
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Driveway Preliminary 05/21/2024 Approved June Amicucci Drive entry must be 16-22’ wide for Residental 18-24’for agricutural. Only one entrance per address is permitted.., storm culvert required of either CMP or RCP minimum size 15in if required., Provide a slope away from road 2% and not exceeding 4% for at least 10’., Driveway entry must meet road at 80-90Degrees and provide required sight distance. Provide permanent address marker at street prior to final inspection., Entrance gates must be 30’ from road edge and open in toward property not the road., Entry monuments must be located outside the ROW., Driveway must provide a minimum of 12’ all weather driving surface equal to 6 inches of class 6 road base and no more than 10% gade at any one point and provide vertical and horizontal clearance., Driveway form inspection is required on any hard surface placed in ROW., Retain all cut/fill slopes maximum 3:1 slope. Revegetate all disturbed areas., Driveway must have turn around at house if developed length is 150’ also minimum turnaround is 20x40 and all weather surface, if its a circular driveway it has to have a 36’radius on circular is required., Driveway with 400’ longer must have emergency pull out area of an addtional 10x30 ft. length. Driveways longer than 400ft require pull out every 400 ft of developed length
COMPLY WITH Douglas County Standards
Drywall 12/30/2024 Approved Brian Schroder  
Electric Service Equipment 12/02/2024 Approved Justin Lett Note-UFER located in NW corner of gym next to main gas pipe entry-must remain accessible

For final-working space at emergency disc required to be as level as possible-110.26
CORE 12/03/2024
Electric Trench 11/21/2024 Approved Justin Lett Note-250urd w/#2 pedestal to emergency disc  
Exterior Lath 12/18/2024 Approved Robert Stratton Stucco and stone lath both installed  
Exterior Wall Sheathing 10/30/2024 Approved Richard Miller Porch posts ok  
Final Building 04/10/2025 Approved Robert Stratton  
Final Driveway 04/14/2025 Approved June Amicucci No issues found for the final driveway inspection
Final Electric 04/04/2025 Disapproved Curt Elliott Complete exterior porch and deck ceilings  
Final Electric 04/10/2025 Approved Curt Elliott  
Final Energy Compliance 04/10/2025 Approved Robert Stratton  
Insulation Thermal 12/18/2024 Approved Robert Stratton  
Interior Gas Line 11/19/2024 Approved Fredrick Mooney Black Hills Energy 11/20/2024
Preliminary Defensible Space 05/20/2024 Approved Dylan Williams
Roof Truss 10/31/2024 Approved Richard Miller  
Rough Electric 12/02/2024 Disapproved Justin Lett 1. Back deck lighting incomplete 2. Revise plans to reflect additional square footage of finished space in basement 3. Move box out at east basement bedroom where behind framing 4. Verify UFER clamp has been changed to aluminum rated clamp  
Rough Electric 12/13/2024 Approved Curt Elliott  
Rough Energy Compliance 12/13/2024 Approved Fredrick Mooney  
Rough Frame 12/02/2024 Disapproved Duke Thompson 1. courtesy walk
2. Update all plans to reflect finished basement
3. Vent fireplaces, 45 kickers or equivalent mono posts throughout basement, water heater vents exceed 50 feet double check manufacturer, no complete inspection given today
4. Plumbing test OK to drain and reconnect all vents
5 Recall, rough frame inspection with roof energy inspection together
 
Rough Frame 12/13/2024 Disapproved Fredrick Mooney 1. Air barrier required behind tub behind kitchen.
2. Foam all boxes in ceiling to attic space.
3. Install thimbles at top of fireplace vents in chase.
4. Master shower needs frame out around waterline in attic.
5. Secure electrical line rear of fp in great room to keep 1” clearance
6. Need kicker at rear beam at corner in basement under slider corner.
7. Need kicker at end of beam into east bedroom doorway. Both sides.

Ok to insulate. Expose all areas noted for inspection.
 
Rough Frame 12/18/2024 Approved Robert Stratton  
Shower Pan 12/18/2024 Approved Robert Stratton 3  
Ufer Ground Electrode 11/25/2024 Approved Anthony Petty eng letter  
Underground Plumbing 09/26/2024 Approved Robert Stratton 1. Foundation insulation is installed.
2. Plumbing test approved with air test.