Building Permit Details
Permit Number: 24-10372
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Residential
Scope of Work: Alteration
Issued Date: 07/02/2024
CO Issue Date:
Plans Examiner: Christopher Polanski
Job Address: 10245 BANEBERRY PL HIGHLANDS RANCH, CO 80129
Building Code: 2021 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drywall 07/29/2024 Disapproved Dusty Welz 1. Two shower walls approved only. Okay to water proof those showers but full house still needs drywall inspection.
2. Also test and inspection required for shower pan.
 
Drywall 08/01/2024 Approved Robert Stratton  
Electric Service Equipment 07/23/2024 Disapproved Richard Perrone 1. Tighten loose riser.
2. Label all circuits - 408.4.
3. Supplemental ground rod required - 250.53(A)(2).
4. #4 Cu GEC to water pipe continuous - 250.64(C). Appears that only a jumper is installed around meter. Cannot reach bottom clamp to verify. Termination shall remain accessible - 250.68(A).
 
Electric Service Equipment 01/14/2025 Disapproved Matt Mazzara 1)cold water pipe GEC must terminate within first 5’ of entry  
Electric Service Equipment 01/29/2025 Approved Matt Mazzara Xcel 01/30/2025
Final Building 01/14/2025 Approved Anthony Frank Water temperatures to be adjusted by end of business today, walked with the builder. Freestanding tub to be adjusted at the 1070.
Water in the main house is 135 degrees. Adjust accordingly. Find a building approved pending final electric approval.
 
Final Electric 01/14/2025 Disapproved Matt Mazzara 1)right mst bath recep inoperable
2)breaker lock req at hood per 110.25
 
Final Electric 01/29/2025 Approved Matt Mazzara  
Final Energy Compliance 01/14/2025 Approved Anthony Frank This is a remodel job, existing HVAC  
Insulation Thermal 07/24/2024 Approved Dusty Welz Insulation approved but you need to get your rough electrical approved prior to next building inspection  
Interior Gas Line 07/23/2024 Approved Anthony Frank No new gas lines installed, replaced gas fireplace, BTUs are within industry standards.  
Rough Electric 07/23/2024 Disapproved Richard Perrone 1. Max 4 cables in stack-it’s for more than 24” (bundling). Derate conductor per 310.15(C) or provide separation. Check throughout.
2. Dining room receptacles shall be on a 20A circuit - 210.11(C)(1), 210.52(B).
3. Nail plates where marked.
Notes: Per DC amendments max 10 openings on 15A ckts, 12 openings on 20A ckts and 4 openings on small appliance branch circuits. Provide written breakdown of new and existing/modified circuits.
 
Rough Electric 07/25/2024 Approved Richard Perrone  
Rough Energy Compliance 07/23/2024 Disapproved Anthony Frank Window inspection can be completed at the rough energy compliance reinspection. Address all tempered glass requirements.  
Rough Energy Compliance 08/20/2024 Approved Dusty Welz Approved  
Rough Frame 07/23/2024 Approved Anthony Frank Windows have not been replaced at this point, I walked with the builder in reference to tempered glass windows to be addressed.  
Rough HVAC 07/23/2024 Approved Anthony Frank Cooktop exhaust has been verified at 600 CFM, make up air has been provided.  
Rough Plumbing 07/23/2024 Approved Anthony Frank Must provide a 1070 mixing valve for the freestanding tub. Install notch plate on the shower valve.  
Shower Pan 08/01/2024 Approved Robert Stratton