Building Permit Details
Permit Number: 21-05022
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 09/14/2021
CO Issue Date: 10/16/2023
Plans Examiner: Anthony Petty, Christine Allen, Christine Lyle, Daniel Davis, Dave Ransom, Greg Lillmars, Kelly Crowther, Rana Rasteh, Rose Dederick, Stuart Foster, Wayne Elmore
Job Address: 8061 PARADISO CT LITTLETON, CO 80125
Building Code: 2018 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 01/26/2022
Steel Letter 01/06/2022
Survey 05/16/2022
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 09/20/2021 Disapproved Damon Montroy 1. ECG required from meter to pedestal (4wire system). Bond neutral and ground at pedestal (first point of disconnect).
2. Wires must bypass meter - jumpers not allowed.
3. Remove main bond jumper from panel to separate grounds and neutral. (Float neutral at panel).
4. Address required to be marked on temp service.
 
Construction Meter 09/21/2021 Approved Damon Montroy IREA 09/22/2021
Drywall 07/11/2022 Approved Robert Stratton  
Electric Service Equipment 06/14/2022 Disapproved Matt Mazzara 1)disconnect CM and seal KO
2)complete feeder terminations and install breakers pedestal
3)cold water pipe GEC req
4)inter system bond req at disconnect (can check at final)
5)label pedestal, disconnect and interior panel breakers 1,2 to match
UFER NE bsmt bed NW corner in ceiling
Note:bsmt electric FP 20amp circuit provided
 
Electric Service Equipment 06/21/2022 Approved Rick Sugar 1) Intersystem bonding terminal bar required at final
2) UFER located NW corner of basement BR
CORE 06/22/2022
Electric Trench 11/16/2021 Approved Damon Montroy 30988 and 30990
- 2 sets of
2x 350 MC AL
1x 4/0 AL
1x 1/0 AL
In a195’ trench
 
Exterior Lath 06/23/2022 Approved Robert Stratton  
Exterior Lath Partial 04/28/2022 Approved Clayton Rodeback For above roof chimney walls.  
Exterior Wall Sheathing 02/11/2022 Approved Robert Stratton  
Final Building 07/10/2023 Cancelled Robert Stratton Final Energy Compliance must be scheduled at the same time as final building, a copy of the blower door test must be on site at time of final inspections also.  
Final Building 07/21/2023 Approved Robert Stratton 1. Paint all exterior PVC and metal vents and gas line at meter.
2. Ok to furnish home.
 
Final Electric 05/19/2023 Disapproved Richard Perrone *2017 NEC*
1. WR receptacles required outdoors/wet locations
2. Provide ladder or cord to check high receptacle by garage doors
3. Cover photo cell(s) to verify all exterior lighting
4. Non TR GFI receptacle in garage north wall
5. Provide ladder or cord to check garage ceiling receptacles
6. No power at south garage receptacles
7. Open grounds at recessed receptacles in dining
8. Install exhaust fan covers throughout
9. No power to powder bath receptacle
10. Non TR GFI receptacles installed in laundry. Will GFI behind washer be readily accessible?
11. Non TR GFI receptacles installed in kitchen. Check throughout house
12. Non TR GFI receptacles installed for dish/disp and are not readily accessible
13. Can lights and incomplete at range
14. Spark ring required for study fireplace receptacle not flush with cabinet
15. Missing receptacle plate in study east wall
16. Smoke detector not permitted within 3’ of ceiling fan blades in east bedroom
17. Fireplaces inoperable
18. Missing spark rings for master bedroom receptacles recessed more than 1/4” in stone
19. CO detector required within 15’ and outside of master bedroom door
 
Final Electric 05/19/2023 Disapproved Richard Perrone **Added** Inspection terminated at main level. Too many items. Basement and lower exterior not checked. Panel interiors and breakers not checked  
Final Electric 06/09/2023 Disapproved Richard Perrone Not all 1st floor corrections made: 7. Open grounds at recessed receptacles in dining when switch is off. Check wiring. 12. GFI receptacles installed for kitchen dish/disp and are not readily accessible. 13. Can lights incomplete above range 18. Spark rings added in master, but not permitted to use wood screws for device. Only 6/32 machine screws permitted.
6/9 inspection:
1. Duplex inserts required for in-use covers throughout. Exposed terminals present.
2. Open grounds at recessed receptacles at stairway when switch is off. Check wiring. Provide ladder or cord to check high up receptacles.
3. Protect exposed horizontal NM cables in unfinished mechanical room subject to physical damage.
4. Label furnace disconnect switches.
5. Receptacle for tankless water heater shall have GFI protection.
6. Receptacle for sump pump shall have GFI protection.
7. Can light trims not securely fastened above wet bar.
8. Seal gap around lower rear patio receptacle so no water can enter box.
9. Receptacle outlet box in built in right of basement fireplace not securely fastened.
10. 2 receptacle outlet boxes above basement fireplace not securely fastened.
11. Inoperable switch in basement J&J bathroom. Inspection terminated, too many items and house not ready for final inspection. Re-inspection fee applied. Panel interiors and breakers not checked.
 
Final Electric 06/20/2023 Disapproved Richard Perrone 1. Handle ties required for multi-wire circuits in panel below basement stairs
2. Circuit directory inaccurate for panel below basement stairs. Revise.
3. 30A breaker required for fire pump. Breaker lock on (closed position) also required
4. Breaker or switch lock outs required for patio heaters once installed.
5. #2 Al SE cable to sub panel only good for 90A
6. Re-identify white conductor as ungrounded conductor at FA pump breaker termination
7. Remove paint from circuit breakers without damaging listing labels.
*Note: Only one A/C init installed. 2nd A/C breaker is 30A
 
Final Electric 07/05/2023 Disapproved Richard Perrone Not all corrections made: 2. Circuit directory inaccurate for panel below basement stairs - 408.4(A). 3. Breaker lock on (closed position) required for fire pump - 695.4(B)(3)(2). Re-inspection fee applied  
Final Electric 07/10/2023 Approved Richard Perrone  
Final Energy Compliance 07/21/2023 Approved Robert Stratton  
Insulation Thermal 06/20/2022 Approved Robert Stratton  
Interior Gas Line 05/19/2022 Approved Robert Stratton 10lbs Xcel 05/19/2022
Midroof 04/29/2022 Approved Robert Stratton  
Moisture Barrier 06/23/2022 Approved Robert Stratton  
Preliminary Defensible Space 05/26/2021 Approved Jill Welle
Roof Truss 05/19/2022 Approved Robert Stratton  
Rough Electric 05/19/2022 Disapproved Rick Sugar 1) DC amendments 10 on a 15 amp circuits, 12 on a 20 , 4 on small appliance circuits
2) Allows clearance at the AC disconnects
3) Exterior PP boxes exceeded box fill
4) Outlet required at the center garage bay
5) No more than 4 NM cables per stacket throughout
6) Dedicated circuits required for the elevator space lighting , machine room and equipment lighting
7) KO filler at study PP box in the study
8) Great room fan box not installed
9) Staircase ceiling box not bonded
10) Running boards at attic accesses
11) Inspection terminated need to inspect basement ,rear grade and decks
 
Rough Electric 06/01/2022 Disapproved Jeremy Bock 1. Bond coach light at garage-east coach light
2. Box fill exceeded at porch pan at patio-master bedroom
3. Add light at under stair closet-bottom of basement stairs
4. Furnace wiring incomplete
5. Secure cables within 12” of panel in furnace room
6. Mechanically bond EGCs at light box in furnace room
7. 6’/ 12’ rule at finished storage room
8. Install fan box at exercise room
9. Install basement patio light cables in listed boxes
10. Outlet required within 6 ft of fixed glass at basement patio doorway
11. Install outlet box at basement fireplace-install dedicated circuit
 
Rough Electric 06/09/2022 Approved Matt Mazzara Note:ded 15amp circuit provided for bsmt electric FP. If 1500 watts or more req 20amp circuit  
Rough Energy Compliance 06/14/2022 Approved Robert Stratton  
Rough Frame 05/19/2022 Cancelled Robert Stratton 1. Not ready  
Rough Frame 06/14/2022 Approved Robert Stratton 1. Install 2 anchor bolts per plate in garage
2. Anchor bolts needed within 12” of all plate breaks or ends
3. Strap top plate back right garage corner
4. Roof vents not installed
5. Nail all garage corners 3 nails 24” oc
6. Nail ALL exterior corners 3 nails 24” oc
7. Remove float blocks basement
8. Ok to insulate
 
Shower Pan 09/26/2022 Approved Robert Stratton 3 pans  
Ufer Ground Electrode 09/30/2021 Approved Damon Montroy 2 UFER access points - one in utility room and one in basement bedroom.
UFER OK.
 
Underground Plumbing 11/01/2021 Approved Kerry Keller