Building Permit Details
Permit Number: 24-13750
Permit Status: Issued
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 11/22/2024
CO Issue Date:
Plans Examiner: Stuart Foster
Job Address: 3590 N STATE HIGHWAY 83 FRANKTOWN, CO 80116
Building Code: 2021 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 07/23/2025
Steel Letter 07/23/2025
Survey 07/23/2025
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 05/29/2025 Approved Brent Althouse CORE 05/30/2025
Driveway Preliminary 09/06/2024 Approved June Amicucci This driveway is for an extension off existing driveway.
New driveway will need 6 inches class six roadbase or equivalent. Driveway will need to be 12ft wide with any drainage that is needed.
There will also need to be a turnaround at the.
COMPLY WITH Douglas County Standards
Drywall 09/23/2025 Approved Clayton Rodeback You need shut off valves at wall mount faucets in master bath. Check all.
Will check at final building.
 
Electric Service Equipment 08/11/2025 Approved Curt Elliott CORE 08/12/2025
Electric Trench 07/31/2025 Approved Curt Elliott 2 runs 4/0 triplex with #2 grounds from ped to house  
Exterior Lath 10/08/2025 Approved Richard Miller  
Exterior Underground Gas Line 08/08/2025 Disapproved Fredrick Mooney Gas line inspected for new custom, line to future barn. Trenching incomplete to supply, ends at septic tank. Ok to backfill from septic tank to terminations. Recall second half when ready.  
Exterior Underground Gas Line 10/06/2025 Approved Fredrick Mooney 10 psi approved.  
Exterior Wall Sheathing 04/07/2025 Approved Clayton Rodeback  
Foundation Insulation 12/04/2024 Approved Clayton Rodeback  
Insulation Thermal 08/26/2025 Disapproved Fredrick Mooney No inspections while spray foam is in progress.
1. Need to schedule rough frame / rough energy compliance with insulation.
2. Need updated approved plans.
 
Insulation Thermal 08/28/2025 Disapproved Fredrick Mooney Need to pass rough frame.  
Insulation Thermal 09/03/2025 Disapproved Fredrick Mooney No updated plans have been received by the plan review team. Do not reschedule this inspection until Plans have been submitted, reviewed and returned approved and stamped. Plans shall be onsite at time of next inspection.  
Insulation Thermal 09/09/2025 Approved Brian Schroder  
Interior Gas Line 08/19/2025 Approved Fredrick Mooney 10 psi. Approved. Black Hills Energy 08/20/2025
Preliminary Defensible Space 09/09/2024 Approved Dylan Williams
Roof Truss 05/21/2025 Approved Clayton Rodeback  
Rough Electric 07/28/2025 Disapproved Curt Elliott Courtesy walk  
Rough Electric 08/11/2025 Approved Curt Elliott  
Rough Energy Compliance 08/19/2025 Disapproved Fredrick Mooney See rough.  
Rough Energy Compliance 08/28/2025 Approved Fredrick Mooney  
Rough Frame 08/19/2025 Disapproved Fredrick Mooney 1. Need air barrier above mbr bathroom.
2. Rough in box at rear all season room ceiling.
3. Multiple boxes in ceiling not foamed.
4. Smoke outside of mbr too close to return air. 3’ minimum distance.
5. Need air barrier above rear slider or full insulation.
6. Need updated plans. Basement beams and connections missing.

Ok to insulate.
 
Rough Frame 08/28/2025 Disapproved Fredrick Mooney Need updated plans that are stamped and approved. Requested at first rough frame. Do not stock.  
Rough Frame 09/03/2025 Disapproved Fredrick Mooney No updated plans have been received by the plan review team. Do not reschedule this inspection until Plans have been submitted, reviewed and returned approved and stamped. Plans shall be onsite at time of next inspection.  
Rough Frame 09/09/2025 Approved Brian Schroder  
Shower Pan 01/21/2026 Approved Fredrick Mooney  
Slab Electrical 03/24/2025 Approved Curt Elliott 5 basement floor boxes. All ran to nearest wall with 3/4” PVC  
Slab Electrical 11/18/2025 Approved Nathan Waldschmidt Master bath floor heat okay to cover.  
Ufer Ground Electrode 07/23/2025 Approved UnassignedElec Approved via Engineer Letter  
Underground Plumbing 12/30/2024 Approved Fredrick Mooney  
Weather Resistive Barrier 06/26/2025 Disapproved Fredrick Mooney Code for gate invalid axis panel now locked out please include gate code in request a comment box  
Weather Resistive Barrier 07/01/2025 Approved Brian Schroder