Building Permit Details
Permit Number: 23-12711
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Residential
Scope of Work: New
Issued Date: 10/17/2023
CO Issue Date:
Plans Examiner: Anthony Petty
Job Address: 4848 RAINTREE CIR PARKER, CO 80134
Building Code: 2021 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 12/27/2023
Steel Letter 12/27/2023
Survey 04/30/2024
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drip Edge 04/05/2024 Approved Duke Thompson Completely install all drip edge  
Drywall 05/24/2024 Disapproved Brian Schroder All “wet areas” tile backer board require non-corrosive screws with 7” OC spacing. All other areas are OK to mud/tape.  
Drywall 05/29/2024 Approved Richard Miller GC rescheduled to 5/29, not ready on 5/28.  
Electric Trench 04/23/2024 Approved Curt Elliott Trench to pool house one 2” and one 1 1/2” PVC  
Exterior Lath 04/24/2024 Approved Dusty Welz 1. Approved  
Exterior Underground Gas Line 04/25/2024 Approved Clayton Rodeback 20psi  
Exterior Underground Gas Line 07/19/2024 Disapproved Brian Schroder Douglas County requires a minimum trench depth of 18”. Test pressure too high, needs to be set at 10psi.  
Exterior Underground Gas Line 07/24/2024 Approved Rick Chadwick  
Exterior Wall Sheathing 02/21/2024 Approved Richard Miller  
Final Building 09/20/2024 Disapproved Rick Chadwick 1. Paint exterior gasline and PVC 2. Splash blocks at sill cocks 3. Seal gasline penetration at exterior 4. Minimum 30” in front of water heater 5. Combustion air required for water heater  
Final Building 10/03/2024 Approved Rick Chadwick  
Final Defensible Space 09/23/2024 Cancelled Jill Welle Inspection not required
Final Defensible Space 10/10/2024 Cancelled Jill Welle inspection not required
Final Electric 09/20/2024 Disapproved Curt Elliott 1. Need working clearance for mech room panel
2. Label furnace disconnect
3. Need grommet for dishwasher cord passing through cabinet
4. Need access to electrical connections in hot tub
 
Final Electric 10/03/2024 Disapproved Justin Lett Bond bushing required at isolated metallic raceway at spa or change to LFNC. Currently isolated between non metallic pieces. If keeping LFMC, adjust fitting at controller so insulated jacket is in connector

Note-GC on site installing bushing at DW
 
Final Electric 10/10/2024 Approved Curt Elliott  
Foundation Insulation 01/03/2024 Disapproved Rick Chadwick Insulation to be run to top of. Foundation  
Foundation Insulation 01/04/2024 Disapproved Rick Chadwick Item not corrected  
Foundation Insulation 01/10/2024 Approved Fredrick Mooney  
Insulation Thermal 05/16/2024 Disapproved Rick Chadwick Straps at headers to top plate incomplete from Rough Frame  
Insulation Thermal 05/17/2024 Approved Rick Chadwick  
Interior Gas Line 05/07/2024 Cancelled Rick Chadwick NOT READY  
Interior Gas Line 05/09/2024 Approved Rick Chadwick  
Midroof 04/05/2024 Approved Duke Thompson  
Preliminary Defensible Space 08/31/2023 Not Applicable Jill Welle
Roof Truss 02/21/2024 Approved Richard Miller Install truss clips complete as required  
Rough Electric 05/08/2024 Approved Curt Elliott AL feeder to pool equipment panel to be pulled back into attic. Will change to CU in j-box with surface raceway to panel in equipment room.  
Rough Frame 05/07/2024 Cancelled Rick Chadwick NOT READY  
Rough Frame 05/09/2024 Disapproved Rick Chadwick 1. Strap gas line over notch at top plate and post girder truss 2. Strap top plates to headers west wall 3. DWV and H2O required to be on test 4. Truss clips at jack trusses above garage 5. Provide pictures of LVL beams at exterior 6. Missing attic vents  
Rough Frame 05/14/2024 Approved Rick Chadwick Check for roof vent at insulation, and complete straps at headers west elevation  
Shower Pan 07/03/2024 Approved Robert Stratton Homeowners son granted me access to the pool house, shower pan is approved  
Slab Electrical 01/11/2024 Approved Thomas Buzo Floor box and conduit ok  
Slab Electrical 07/26/2024 Approved Curt Elliott In floor heat mat  
Underground Plumbing 12/19/2023 Approved Rick Chadwick  
Weather Resistive Barrier 04/10/2024 Disapproved Rick Chadwick 1. Install Z flashing at overhead doors 2. Seal around all electrical penetrations 3. Housewrap to extend minimum 1” past sill 4. At off set at foundation Z flashing required  
Weather Resistive Barrier 04/12/2024 Approved Rick Chadwick