Toggle navigation
Building Division Online Services
Department of Public Works Engineering, Building Division
Apply for Permits
Inspections
Schedule Inspections
Cancel Inspections
Searches
Search Contractors
Search Permits
Search Address Jurisdiction
Sign-In
My Profile
Sign Out
Building Permit Details
Permit Number:
12-15016
Permit Status:
Completed
Permit Type:
Building
Project Type:
Residential
Description of Work:
RS - Duplex
Scope of Work:
New
Issued Date:
12/05/2012
CO Issue Date:
06/19/2013
Plans Examiner:
Angie Velasquez, Daniel Davis, Dave Ransom, Leonard Lucero, Martha Mahr, Matt Archer, Rose Dederick
Job Address:
4334 CHATEAU RIDGE RD CASTLE ROCK, CO 80108
Building Code:
2006 IRC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Caisson/Footer/WG Letter
03/21/2013
Steel Letter
03/21/2013
Survey
03/21/2013
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Construction Meter
12/18/2012
Approved
Rich Edgett
IREA 12/19/2012
Print Report
Drip Edge
03/14/2013
Cancelled
Kerry Keller
Print Report
Drip Edge
03/15/2013
Approved
Kerry Keller
Print Report
Drywall
04/08/2013
Approved
Kerry Keller
Print Report
Electric Service Equipment
03/28/2013
Approved
Rich Edgett
Meter is already set
IREA 03/29/2013
Print Report
Electric Trench
03/21/2013
Approved
Rich Edgett
Service Lateral
Print Report
Exterior Lath
04/12/2013
Disapproved
Kerry Keller
1- your weep screeds has very little holes in screed and some has no holes. please provide manufacturer specs.
Print Report
Exterior Lath
04/15/2013
Approved
Kerry Keller
Print Report
Exterior Lath Partial
04/29/2013
Cancelled
Kerry Keller
Print Report
Exterior Wall Sheathing
02/20/2013
Approved
Kerry Keller
Print Report
Final Building
06/17/2013
Disapproved
Kerry Keller
res
Print Report
Final Building
06/18/2013
Approved
Kerry Keller
Print Report
Final Electric
06/17/2013
Disapproved
Rich Edgett
Scanned Ticket
Print Report
Final Electric
06/18/2013
Approved
Rich Edgett
Grommet hole to be installed @ desk (Granite is backordered)
Correct and Procede
Print Report
Final Energy Compliance
06/17/2013
Disapproved
Kerry Keller
res
Print Report
Final Energy Compliance
06/18/2013
Approved
Kerry Keller
Print Report
Final HVAC
06/04/2013
Disapproved
Kerry Keller
see insp in cms
Print Report
Final HVAC
06/17/2013
Approved
Kerry Keller
Print Report
Final Plumbing
06/17/2013
Disapproved
Kerry Keller
res
Print Report
Final Plumbing
06/18/2013
Approved
Kerry Keller
Print Report
Firewall
03/05/2013
Cancelled
Kerry Keller
Print Report
Firewall
03/06/2013
Approved
Kerry Keller
Print Report
Insulation Thermal
04/01/2013
Disapproved
Kerry Keller
Need your Rescheck for inspection
Print Report
Insulation Thermal
04/03/2013
Approved
Kerry Keller
Print Report
Interior Gas Line
03/19/2013
Approved
Kerry Keller
Black Hills Energy 03/20/2013
Print Report
Midroof
03/12/2013
Cancelled
Kerry Keller
Not Ready
Print Report
Midroof
03/20/2013
Approved
Rich Garrett
Print Report
Moisture Barrier
03/05/2013
Cancelled
Kerry Keller
Print Report
Moisture Barrier
04/29/2013
Approved
Kerry Keller
Print Report
Roof Truss
03/05/2013
Cancelled
Kerry Keller
Print Report
Roof Truss
03/06/2013
Approved
Kerry Keller
Print Report
Rough Electric
03/25/2013
Disapproved
Rich Edgett
1) Fire Dept approval required
2) Service is NOT to be energized until after inspection
3) Install p-ring @ mstr bath floor heat
4) 4AWG SER @ mstr vanity??
5) Recept @ right of sliding glass door in mstr bdrm is over 6"
6) Additional recept may be required @ front grade level
7) Elect. box in hall by laundry (up high) is not wired
8) PEX clearance to canlights
9) GEC to plastic water pipe???
10) Bond Cu sprinkler pipe in unfinished bsmnt
11) Sprinkler pipe incomplete
12) Box in bsmnt unfinished ceiling near I-beam is not wired
NOTE: 2 j-boxes in cabinet @ left of Range
Print Report
Rough Electric
03/27/2013
Disapproved
Rich Edgett
1) Add recepts @ bar tops in bsmnt
2) PEX clearance to canlight in bsmnt shower
NOTE: Speaker prewires in ceiling are NOT boxed
OK to insulate pending Frame approval
Print Report
Rough Energy Compliance
03/26/2013
Approved
Kerry Keller
Print Report
Rough Frame
03/26/2013
Disapproved
Kerry Keller
1-Provide Anchor Bolts with 12'' of Bottom Plate Splices
2-Provide Eng. on Stair Frame Change
3-Provide Eng. on Hole Drilled for Elect. Floor Truss
Print Report
Rough Frame
04/01/2013
Cancelled
Kerry Keller
Print Report
Rough Frame
04/03/2013
Approved
Kerry Keller
See new Floor Truss in CMS
Print Report
Rough Frame Partial
02/20/2013
Approved
Kerry Keller
ok on porchs and columns
Print Report
Rough HVAC
03/26/2013
Approved
Kerry Keller
Print Report
Rough Plumbing
03/26/2013
Disapproved
Kerry Keller
RES See Insp. in CMS
Print Report
Rough Plumbing
03/28/2013
Disapproved
Kerry Keller
1- Items not #3,5 for 3-26-13 inspection
Print Report
Rough Plumbing
04/01/2013
Approved
Kerry Keller
Print Report
Shower Pan
03/19/2013
Approved
Kerry Keller
Print Report
Special Inspection
03/15/2013
Approved
Kerry Keller
1- Okay on per slope of shower pan
Print Report
Underground Plumbing
01/30/2013
Approved
Kerry Keller
Print Report
Weather Resistive Barrier
03/06/2013
Approved
Kerry Keller
Print Report