Building Permit Details
Permit Number: 24-13888
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Residential
Scope of Work: Alteration
Issued Date: 09/09/2024
CO Issue Date:
Plans Examiner: Stuart Foster
Job Address: 10552 JAGUAR PT LITTLETON, CO 80124
Building Code: 2021 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drywall 09/12/2024 Approved Dusty Welz Drywall approved for master shower only.  
Drywall 10/30/2024 Disapproved Dusty Welz Not ready, field canceled.
 
Drywall 11/15/2024 Approved Dusty Welz Approved  
Drywall Partial 10/31/2024 Approved Dusty Welz Bathroom #2 of 3, 2nd floor guest bathroom drywall approved.  
Final Building 10/22/2024 Disapproved Brian Schroder Final approval for Mstr bath only. 2 more bathrooms on permit for future inspections.  
Final Building 12/03/2024 Approved Robert Stratton All three bathrooms completed no issues found  
Final Electric 10/22/2024 Disapproved Henry VanSchaack 1) open j-box on ceiling
2) hall and j-j bathroom roughs not done
 
Final Electric 12/03/2024 Approved Henry VanSchaack  
Final Energy Compliance 10/22/2024 Cancelled Brian Schroder N/A  
Final Energy Compliance 12/03/2024 Cancelled Robert Stratton N/A  
Interior Gas Line 09/10/2024 Cancelled Dusty Welz N/a  
Interior Gas Line 10/25/2024 Cancelled Dusty Welz N/a  
Interior Gas Line 11/14/2024 Cancelled Brian Schroder N/A  
Rough Electric 09/10/2024 Disapproved Matt Mazzara 1)only required receps within 3’ of sinks and counter top receps permitted 20amp bath circuits 210.11(C)3
2)existing safety concerns mst bath CF box-NM connector, fill unused opening and ground. Must meet clearances per 410.10(D)
3)wiring incomplete 2nd vanity light
4)electric/remodel incomplete other 2 bathrooms
Note:per Doug Co amendments max 10 openings 15amp circuits and 12 openings 20amp circuits. If existing circuit(s) modified detailed written breakdown will be required
 
Rough Electric 09/12/2024 Disapproved Henry VanSchaack 1) guest bath and j-j bath incomplete
Approved— master bath
 
Rough Electric 10/25/2024 Disapproved Henry VanSchaack J-j bath not done
Approved— hall bath, no electrical work
 
Rough Electric 11/14/2024 Approved Henry VanSchaack Existing light and recep, no new wiring  
Rough Energy Compliance 09/10/2024 Cancelled Dusty Welz Partial generated  
Rough Energy Compliance 10/25/2024 Cancelled Dusty Welz N/A  
Rough Energy Compliance 11/14/2024 Approved Brian Schroder Bathroom number three of three  
Rough Frame 09/10/2024 Cancelled Dusty Welz Partial generated  
Rough Frame 10/25/2024 Disapproved Dusty Welz Need rough plumbing inspection. Okay to drywall all sides except around shower valve and tub connection. Tub not installed yet or shower valve.  
Rough Frame 11/14/2024 Approved Brian Schroder Bathroom number three of three  
Rough Frame Partial 09/10/2024 Approved Dusty Welz Rough plumbing, rough frame approved for master bathroom only. New bath fan not installed yet.  
Rough HVAC 09/10/2024 Cancelled Dusty Welz Partial generated  
Rough HVAC 10/25/2024 Approved Dusty Welz Approved  
Rough Plumbing 09/10/2024 Cancelled Dusty Welz Partial generated  
Rough Plumbing 10/25/2024 Disapproved Dusty Welz Not complete. Install tub and shower valve.  
Rough Plumbing 10/30/2024 Disapproved Dusty Welz Not ready, field canceled.  
Rough Plumbing 10/31/2024 Cancelled Dusty Welz Partials generated  
Rough Plumbing 11/14/2024 Approved Brian Schroder Bathroom number three of three  
Rough Plumbing Partial 10/31/2024 Approved Dusty Welz Bathroom #2 of 3, 2nd floor bathroom rough plumbing approved.  
Shower Pan 09/16/2024 Approved Dusty Welz 1. Shower pan approved for master shower only.  
Shower Pan 11/15/2024 Approved Dusty Welz Approved