Building Permit Details
Permit Number:
24-04197
Permit Status:
Completed
Permit Type:
Building
Project Type:
Residential
Description of Work:
RS - Residential
Scope of Work:
Alteration
Issued Date:
03/28/2024
CO Issue Date:
Plans Examiner:
Dave Ransom
Job Address:
3042 WYECLIFF WAY HIGHLANDS RANCH, CO 80126
Building Code:
2021 IRC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Drywall
04/12/2024
Approved
Dusty Welz
1. Recall drywall when backer board is up. Okay to mud and tape all regular drywall and finish guest bathroom. Backer board was inspected in guest bathroom and approved.
Print Report
Final Building
06/10/2024
Approved
Dusty Welz
Master bathroom and guest bathroom on second floor. Approved
Print Report
Final Electric
06/10/2024
Approved
Matt Mazzara
1)group circuits conductors in new sub 200.4(B)
Correct and proceed
Print Report
Interior Gas Line
04/10/2024
Cancelled
Dusty Welz
N/A
Print Report
Rough Electric
04/10/2024
Approved
Matt Mazzara
J&J 1 to 3 vanity lts
Mst doorway/2 bed receps relocated and ltg/switches
All receps existing
Print Report
Rough Frame
04/10/2024
Disapproved
Dusty Welz
1. Jack and Jill bathroom rough inspections approved. Okay to drywall everything in that shower.
2. In master, it is okay to drywall separating wall to bedroom and patch ceiling only. Rough inspection still needed for master.
3. Call for drywall when ready for jack and Jill and patch work in master.
Print Report
Rough Frame
04/12/2024
Approved
Dusty Welz
1. Rough frame and rough plumbing approved. 1070 mixing valve is integrated into tub filler mixing valve.
2. Rough frame approved for both bathrooms.
Print Report
Rough Plumbing
04/10/2024
Disapproved
Dusty Welz
See rough frame
Print Report
Shower Pan
04/23/2024
Approved
Dusty Welz
1. Shower pan and backer board approved in master shower. Proceed to final inspections.
Print Report