Building Permit Details
Permit Number:
23-21414
Permit Status:
Completed
Permit Type:
Building
Project Type:
Commercial
Description of Work:
CM - Commercial
Scope of Work:
New
Issued Date:
06/26/2024
CO Issue Date:
07/21/2025
Plans Examiner:
Stuart Foster, Wayne Elmore
Job Address:
8367 N RAMPART RANGE RD LITTLETON, CO 80125
Building Code:
2021 IBC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Caisson/Footer/WG Letter
02/20/2025
Steel Letter
02/20/2025
Survey
02/20/2025
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Construction Meter
09/24/2024
Disapproved
Henry VanSchaack
1) provide fault current calculations to verify type of cold sequence fuses required
2) bond supply side metal raceway per 250.92
3) bottom GFCI recep must be wr type per 406.9
Print Report
Construction Meter
09/25/2024
Approved
Henry VanSchaack
Xcel 09/25/2024
Print Report
Drip Edge
03/24/2025
Approved
Fredrick Mooney
Print Report
Drywall
03/24/2025
Disapproved
Fredrick Mooney
Partial approved. Complete bathroom, foyer and mechanical.
Print Report
Drywall
03/26/2025
Approved
Robert Stratton
All drywall completed and approved.
Print Report
Electric Service Equipment
04/02/2025
Disapproved
Jonathan Pastore
1. 250.24(4) MBJ wire type sized per 250.102C1 If the main bonding jumper specified in 250.28 is a wire or busbar and is installed from the grounded conductor terminal bar or bus to the equipment grounding terminal bar or bus in the service equipment, the grounding electrode conductor shall be permitted to be connected to the equipment grounding terminal, bar, or bus to which the main bonding jumper is connected.
200.2(B) Continuity. The continuity of a grounded conductor shall not depend on a connection to a metal enclosure, raceway, or cable armor.
2. CT cabinet bonding jumper shall be sized per 250.102C1
3. Engineer letter states exothermic welding connections to ground rods
Print Report
Electric Service Equipment
04/03/2025
Approved
Jonathan Pastore
Will verify Cadweld connections to two 3/4”x8’ ground rods @ final
Xcel 04/04/2025
Print Report
Electric Trench
03/06/2025
Cancelled
Jonathan Pastore
Changing to trench partial
Print Report
Electric Trench
03/07/2025
Approved
Jonathan Pastore
Pile base detail #6 CU tails for lot lights
Print Report
Electric Trench Partial
10/31/2024
Approved
Matt Mazzara
Consultation to discuss site lighting
Print Report
Electric Trench Partial
03/06/2025
Approved
Jonathan Pastore
Laterals: 2x4” with 4” spare (schedule 80 @ expansion coming from grade)
2 Sump lines 2x3/4” each
Site lighting 3/4” new (existing pole lights 1”). Monument sign coming out of ground box separate inspection) **missing bonding for pole base detail**
Print Report
Exterior Lath
04/22/2025
Approved
Brian Schroder
Print Report
Exterior Wall Sheathing
01/28/2025
Approved
Robert Stratton
Print Report
Final Building
05/13/2025
Approved
Robert Stratton
Print Report
Final Electric
05/12/2025
Disapproved
Jeremy Bock
1. GFCI protection required at door opener outlets
2. GFCI protection required at receptacle within 6 ft of sink basin at utility room
3. Below grade outlets require GFCI protection-check all
4. GFCI receptacle at tanks in basement must be readily accessible
5. Cover photo eye to test monument sign
Note-fire dept and final building inspections not approved
Print Report
Final Electric
05/13/2025
Disapproved
Jonathan Pastore
1. Heater ceiling receptacles shall be GFCI protected
Print Report
Final Electric
05/14/2025
Approved
Jonathan Pastore
Print Report
Final HVAC
05/07/2025
Disapproved
Robert Stratton
1. Reschedule final HVAC inspection with final building inspection, after fire department final inspection approval is completed.
2. Provide TAB report.
Print Report
Final HVAC
05/08/2025
Cancelled
Robert Stratton
Reschedule final HVAC with final building inspection after fire department final inspection is approved and a final electric inspection has been performed.
Print Report
Final HVAC
05/13/2025
Approved
Robert Stratton
Print Report
Final Plumbing
05/07/2025
Approved
Robert Stratton
Print Report
Insulation Thermal
03/13/2025
Approved
Duke Thompson
Drying all penetrations at roofline
Print Report
Insulation Thermal Partial
01/28/2025
Cancelled
Robert Stratton
Voids above overhead Garage doors verified.
Print Report
Interior Gas Line
02/19/2025
Approved
Robert Stratton
20lbs test
Xcel 02/19/2025
Print Report
Interior Gas Line
02/19/2025
Cancelled
Richard Miller
All roughs are to be scheduled together, ie rough frame and energy compliance
Print Report
Moisture Barrier
04/22/2025
Approved
Brian Schroder
Print Report
Roof Truss
01/28/2025
Approved
Robert Stratton
Print Report
Rough Electric
02/28/2025
Approved
Henry VanSchaack
Print Report
Rough Electric
04/11/2025
Approved
Jonathan Pastore
Ground rods per engineered plan with exothermic welds
Print Report
Rough Electric Partial
09/23/2024
Cancelled
Henry VanSchaack
GC Cancelled
Print Report
Rough Electric Partial
09/23/2024
Cancelled
UnassignedBldg
Cancelled by Web user.
Print Report
Rough Frame
03/13/2025
Approved
Duke Thompson
Fire block, mechanical chase at top in mechanical room
Print Report
Rough HVAC
03/12/2025
Approved
Duke Thompson
Need duct at FAU
Print Report
Rough HVAC Partial
02/28/2025
Approved
Duke Thompson
Ductwork only above customer service room
Print Report
Rough Plumbing Partial
02/19/2025
Approved
Robert Stratton
Basement rough plumbing inspected today and plumbing test verified good.
Print Report
Ufer Ground Electrode
11/13/2024
Approved
Jonathan Pastore
One line drawing shows #4 connected to re-bar by Caldwell, omitted. Provide letter from engineer for acceptance since it isn’t following the stamped drawing.
1/0 copper for UFER matches one-line
Print Report