Building Permit Details
Permit Number: 05-05762
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 09/26/2005
CO Issue Date: 06/29/2006
Plans Examiner: Angie Velasquez, Bill Barani, David Howard, George Lechowicz, Joe Montoya, Karen Schultz, Kim Harris, Martha Mahr, jward
Job Address: 9175 RED POPPY CT PARKER, CO 80138
Building Code:
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 09/01/2005
Steel Letter 09/15/2005
Survey 01/03/2006
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 10/03/2005 Disapproved Rich Edgett Reschedule  
Construction Meter 10/04/2005 Approved Rich Edgett IREA 10/05/2005
Drip Edge 04/06/2006 Approved John Mulligan  
Driveway Form 03/07/2006 Disapproved Jill Welle res
Driveway Form 03/16/2006 Approved Jill Welle
Driveway Preliminary 08/24/2005 Approved Jill Welle
Drywall 03/15/2006 Approved John Mulligan  
Electric Service Equipment 02/27/2006 Approved Rich Edgett IREA 02/28/2006
Electric Trench Partial 01/13/2006 Approved Troy Meissner  
Exterior Lath 01/18/2006 Approved John Mulligan  
Exterior Sheathing 12/28/2005 Disapproved Jerry Wlodarek complete blocking at seams to 48" of corners  
Exterior Sheathing 12/30/2005 Approved Jerry Wlodarek  
Final Electric 06/26/2006 Disapproved Rich Edgett Reschedule  
Final Electric 06/28/2006 Approved Rich Edgett  
Final Frame 06/28/2006 Approved Jerry Wlodarek  
Final Grade 06/20/2006 Approved Maura McGovern
Insulation Thermal 02/27/2006 Approved John Mulligan  
Interior Gas Line 02/07/2006 Cancelled John Mulligan  
Interior Gas Line 02/16/2006 Approved John Mulligan passed Black Hills Energy 02/17/2006
Interior Gas Line 02/16/2006 Cancelled John Mulligan  
Moisture Barrier 01/18/2006 Approved John Mulligan  
Preliminary DESC 11/07/2005 Approved Maura McGovern
Preliminary Defensible Space 08/24/2005 Approved Jill Welle
Rough Electric 02/08/2006 Cancelled Rich Edgett  
Rough Electric 02/15/2006 Disapproved Rich Edgett Reschedule  
Rough Electric 02/17/2006 Cancelled Rich Edgett  
Rough Electric 02/27/2006 Approved Rich Edgett  
Rough Frame 02/07/2006 Cancelled John Mulligan  
Rough Frame 02/16/2006 Disapproved John Mulligan res3  
Rough Frame 02/16/2006 Cancelled John Mulligan  
Rough Frame 02/27/2006 Approved John Mulligan  
Shower Pan 04/07/2006 Cancelled John Mulligan  
Shower Pan 04/20/2006 Approved John Mulligan  
Underground Plumbing 09/28/2005 Approved Jerry Wlodarek