Toggle navigation
Building Division Online Services
Department of Public Works Engineering, Building Division
Apply for Permits
Inspections
Schedule Inspections
Cancel Inspections
Searches
Search Contractors
Search Permits
Search Address Jurisdiction
Sign-In
My Profile
Sign Out
Building Permit Details
Permit Number:
20-08037
Permit Status:
Completed
Permit Type:
Building
Project Type:
Residential
Description of Work:
RS - Basement
Scope of Work:
Alteration
Issued Date:
08/26/2020
CO Issue Date:
Plans Examiner:
Stuart Foster
Job Address:
11069 MEADOWVALE CIR HIGHLANDS RANCH, CO 80130
Building Code:
2018 IRC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Drywall
09/23/2020
Approved
Carlo Turchiano
Check mech room insulation at final
Check photos of drywall in bedroom closet
Print Report
Final Building
11/10/2020
Disapproved
Chris Fuller
Vapor barrier for insulation in mechanical room, ceiling too
Print Report
Final Building
11/12/2020
Approved
Chris Fuller
Put plastic over ceiling insulation of mechanical room
Print Report
Final Electric
11/10/2020
Disapproved
Matt Mazzara
1)bath recep req GFCI protected
2)rec rm wall recep within 6’ of bar sink req GFCI protected 210.8
3)Siemens breaker not listed for use in GE panel (bsmt sub)
4)bond CSST #6cu, main service or electrode to accessible hard pipe upstream
Print Report
Final Electric
11/16/2020
Approved
Matt Mazzara
Print Report
Fireblocking
09/16/2020
Approved
Chris Fuller
Print Report
Interior Gas Line
09/16/2020
Approved
Chris Fuller
No changes to gas
Print Report
Rough Electric
09/16/2020
Approved
Matt Mazzara
Bond CSST at accessible hard pipe upstream #6cu
Check at final
Print Report
Rough Frame
09/16/2020
Approved
Chris Fuller
Insulate mechanical room walls ceiling ductwork pipes by final
Egress ladder by final
Rotate water heater for 30 inch clearance in front by final.
Print Report
Underground Plumbing
09/16/2020
Approved
Chris Fuller
Print Report