Building Permit Details
Permit Number: 19-12146
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 01/24/2020
CO Issue Date: 11/25/2020
Plans Examiner: Anthony Petty
Job Address: 6832 YAMPA DR LARKSPUR, CO 80118
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 07/08/2020
Steel Letter 07/08/2020
Survey 07/08/2020
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 01/27/2020 Cancelled Rick Sugar Construction meter not set  
Construction Meter 02/12/2020 Disapproved Rick Sugar See scanned ticket  
Construction Meter 02/24/2020 Disapproved Rick Sugar Meter jumpers not allowed
GEC must terminate on the EG terminal bar
 
Construction Meter 02/27/2020 Approved Rick Sugar IREA 02/28/2020
Driveway Preliminary 10/23/2019 Approved Jill Welle
Drywall 08/07/2020 Disapproved Kerry Keller Need to cover I-Beams and steel posts at south garage
Ok to tape and mud
 
Drywall 10/16/2020 Approved Kerry Keller  
Electric Service Equipment 11/05/2020 Disapproved Rick Sugar UFER Grounding electrode conductor not terminated in the 200 Amp disconnects
Need to verify plastic or copper coming into the house for the second grounding electrode system
 
Electric Service Equipment 11/06/2020 Disapproved Rick Sugar Terminate the equipment grounding conductor at pedestal
White and green face tape at conductors in the pedestal
 
Electric Service Equipment 11/12/2020 Approved Rick Sugar IREA 11/13/2020
Electric Trench 09/30/2020 Approved Rick Sugar (2) 2 1/2 inch PVC pipes 140 foot trench  
Exterior Wall Sheathing 05/01/2020 Approved Kerry Keller  
Final Building 11/20/2020 Disapproved Kerry Keller 1) Need permanent address posted
2) Rear deck stairs is off on rise seven and three-quarter max rise
3) 4 inch max spear spacing at rear deck stairs risers
4) Install plug at rear patio gas shut off
5) Adjust fire door closers to self Close and latch
6) Missing fire door labels on three fire doors
 
Final Building 11/24/2020 Approved Kerry Keller  
Final Defensible Space 11/24/2020 Approved Jill Welle Finishing
Final Driveway 11/24/2020 Approved Jill Welle Rock, asphalt coming
Final Electric 11/20/2020 Disapproved Rick Sugar Note no more than four openings on a small appliance circuit
2’4 foot rule at coffee bar in kitchen
Island outlet cannot exceed 6 inches of overhang at countertop
Main house kitchen hood not installed
Running boards required at north garage east wall and staircase
Kitchen hood not terminated and father-in-law Suite
Need location of GFCI to test soffit outlet
Light required at well disconnect in the crawlspace, need to inspect fuse size GFCI lights in crawlspace
Breaker locks required for kitchen hoods
Arc fault the kitchen hood circuits
Arc fault the stairway lighting in the father-in-law suite
#10 EGC at both AC units
 
Final Electric 11/24/2020 Approved Rick Sugar  
Insulation Thermal 07/31/2020 Approved Kerry Keller  
Interior Gas Line 07/08/2020 Cancelled UnassignedBldg Cx by Norm  
Interior Gas Line 07/16/2020 Approved Kerry Keller Black Hills Energy 07/17/2020
Moisture Barrier 08/03/2020 Approved Kerry Keller  
Preliminary Defensible Space 10/23/2019 Approved Jill Welle Final inspection required
Roof Truss 05/14/2020 Approved Kerry Keller  
Rough Electric 07/08/2020 Cancelled Rick Sugar Cx by Norm  
Rough Electric 07/16/2020 Disapproved Damon Montroy 1. Complete Lights and outlets outside.
2. Complete fireplace and exhaust fans throughout.
3. Complete grounding electrode conductor run.
4.. finish roof for rough inspection.
 
Rough Electric 07/27/2020 Approved Rick Sugar  
Rough Energy Compliance 07/16/2020 Approved Kerry Keller  
Rough Frame 07/08/2020 Cancelled UnassignedBldg Cx by Norm  
Rough Frame 07/16/2020 Approved Kerry Keller  
Shower Pan 10/20/2020 Approved Kerry Keller  
Ufer Ground Electrode 07/08/2020 Approved Wayne Elmore Engineer letter  
Underground Plumbing 03/05/2020 Approved Kerry Keller Foundation insulation ? need to see your Rem/Rate to see if needed at 3 car
Underground plumbing approved
 
Weather Resistive Barrier 05/12/2020 Approved Kerry Keller