Building Permit Details
Permit Number: 19-02342
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 05/17/2019
CO Issue Date: 01/04/2021
Plans Examiner: Amanda Hansen, Anthony Petty, Christine Allen, Daniel Davis, Dave Ransom, Donna Martin, Greg Lillmars, Kelly Crowther, Rana Rasteh, Rose Dederick, Stuart Foster, Wayne Elmore
Job Address: 913 W WOLFENSBERGER RD CASTLE ROCK, CO 80109
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 07/01/2019
Steel Letter 07/01/2019
Survey 01/13/2020
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Driveway Preliminary 03/25/2019 Approved Jill Welle
Drywall 04/14/2020 Approved Kerry Keller  
Electric Service Equipment 01/04/2021 Approved Matt Mazzara 1)UFER clamp listing for 1 conductor
Correct and proceed
UFER left of bsmt panels
 
Electric Trench 12/20/2019 Approved Henry VanSchaack Per to house, 3x 2” conduits  
Exterior Lath 09/28/2020 Approved Kerry Keller  
Exterior Wall Sheathing 09/18/2019 Approved Kerry Keller  
Final Building 12/21/2020 Disapproved Kerry Keller 1} Paint PVC VENTS and complete furnace termination cap
2} Complete termination caps at rear soffits
3} Complete a landing at garage man door to exterior
4} Provide guardrail at upper sliding door off office
5} Cap off plumbing fixtures that not installed
6} Complete wood stove
 
Final Building 12/24/2020 Approved Kerry Keller  
Final Defensible Space 12/21/2020 Approved Jill Welle
Final Driveway 12/21/2020 Approved Jill Welle Additional rock coming when weather permits
Final Electric 12/21/2020 Disapproved Rick Sugar No more than 4 openings on a small appliance circuit
Gfci required within 6’ of the rough plumbing in the 2 floor play room
Bond master bathroom tub
2 floor main hallway smoke detector has no power
Gfci required throughout the unfinished areas
Running boards in the unfinished areas
Furnace disconnect switch must indicate on/off
Secure FMC within 6’ of panels
Inter system bonding terminal bar required
Appliance cord required at the water heater circulation pump
Label circuits at the garage sub panel
Note
Need to schedule a electrical service inspection
 
Final Electric 12/30/2020 Disapproved Rick Sugar Need to schedule a electric service inspection, before final electrical can be approved  
Final Electric 01/04/2021 Approved Matt Mazzara  
Final Energy Compliance 12/21/2020 Approved Kerry Keller  
Foundation Insulation 06/17/2019 Approved Kerry Keller  
Insulation Thermal 03/17/2020 Approved Kerry Keller  
Interior Gas Line 02/19/2020 Approved Robert Stratton 10lbs test Black Hills Energy 02/20/2020
Moisture Barrier 09/28/2020 Approved Kerry Keller  
Preliminary Defensible Space 03/21/2019 Approved Jill Welle Final inspection required
Roof Truss 02/19/2020 Approved Robert Stratton  
Rough Electric 01/15/2020 Disapproved Rick Sugar See scanned ticket  
Rough Electric 01/24/2020 Approved Rick Sugar  
Rough Energy Compliance 03/02/2020 Approved Kerry Keller  
Rough Frame 03/02/2020 Approved Kerry Keller  
Shower Pan 03/17/2020 Approved Kerry Keller  
Underground Plumbing 07/12/2019 Approved Kerry Keller  
Weather Resistive Barrier 03/02/2020 Approved Kerry Keller