Building Permit Details
Permit Number: 18-04232
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 12/04/2018
CO Issue Date: 11/17/2020
Plans Examiner: Anthony Petty
Job Address: 1000 W NOE RD LARKSPUR, CO 80118
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 11/05/2019
Steel Letter 11/05/2019
Survey 11/07/2019
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Driveway Preliminary 05/15/2018 Approved Jill Welle
Drywall 12/05/2019 Approved Robert Stratton  
Electric Service Equipment 01/07/2020 Disapproved Rick Sugar See scanned ticket  
Electric Service Equipment 01/08/2020 Approved Rick Sugar 400 amp service IREA 01/09/2020
Electric Trench 11/13/2019 Disapproved Rick Sugar 210' 2-21/2 PVC 1-11/4" PVC
Need to inspect 30' at the house, 50' at the pedestal
 
Electric Trench 11/15/2019 Approved Rick Sugar  
Exterior Underground Gas Line 11/13/2019 Approved Kerry Keller  
Final Building 06/10/2020 Disapproved Kerry Keller 1) Paint black iron gas piping at gas regulator and south side exterior piping
2) Paint PVC flues and vents at rear upper roof
3) Seal around A/C line sets
4) Bottom rise is off at entry stairs both set of stairs
5) Adjust fire door closer so to self close
6) Provide gas shut off at fire place needs to be ready access
 
Final Building 06/17/2020 Approved Kerry Keller  
Final Defensible Space 10/30/2020 Cancelled Jill Welle Need to defer inspection until Monday late morning
Final Defensible Space 11/03/2020 Approved Jill Welle
Final Driveway 10/30/2020 Cancelled Jill Welle Asphalt needs to be cut back. Road Maintenance Foreman contacted me with concern. Will interfere with maintenance and be damaged during snow removal. Will need to defer inspection until Monday. Call if needed 303-88-5252
Final Driveway 11/17/2020 Approved Jill Welle
Final Electric 05/21/2020 Disapproved Rick Sugar See scanned ticket  
Final Electric 05/28/2020 Approved Brian Brown  
Final Energy Compliance 10/30/2020 Approved Kerry Keller  
Final HVAC 06/08/2020 Approved Kerry Keller  
Final Plumbing 06/02/2020 Disapproved Kerry Keller House is locked ,No access for inspection  
Final Plumbing 06/09/2020 Cancelled Kerry Keller Will do final Plumbing with Final building inspection  
Final Plumbing 06/10/2020 Disapproved Kerry Keller 1) Need purple primer at H2o heater vent on all fitting
2) Provide outside combustion air for H2o heater
3) Secure Gas line at H2o heater
Need H2o heater up and working for inspection
 
Insulation Thermal 11/20/2019 Disapproved Kerry Keller Partial insulation only on upper living space
Still need to complete all rough frame items, Recall rough frame with your next insulation on lower half.
 
Insulation Thermal 11/25/2019 Approved Kerry Keller  
Interior Gas Line 11/13/2019 Approved Kerry Keller L.P. Gas  
Moisture Barrier 01/16/2020 Approved Kerry Keller  
Preliminary Defensible Space 05/15/2018 Approved Jill Welle final inspection required
Rough Electric 11/12/2019 Disapproved Rick Sugar See scanned ticket  
Rough Electric 11/13/2019 Disapproved Rick Sugar Bond RV 4 square boxes in the garage
Open exterior boxes to inspect
Smoke detector required on the main level
6' rule left of the fireplace
 
Rough Electric 11/15/2019 Approved Rick Sugar  
Rough Energy Compliance 11/18/2019 Approved Kerry Keller AM requested  
Rough Frame 11/13/2019 Approved Kerry Keller 1) Complete all HVAC WORK
2) Fire stop fire place chase max of 10'
3) Need to complete fire and draft stopping through out
4) Provide Engineer letter on deck frame and ledger attachment also for EPDM roof for dry deck Third party inspection
Call for rough energy inspection after completed
 
Rough Frame 12/05/2019 Approved Robert Stratton  
Shower Pan 12/13/2019 Approved Kerry Keller  
Underground Plumbing 12/10/2018 Approved Clayton Rodeback Inspection done on 11-19-2018