Building Permit Details
Permit Number: 18-00824
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Residential
Scope of Work: Alteration
Issued Date: 02/08/2018
CO Issue Date:
Plans Examiner: Anthony Petty, Daniel Davis, Dave Ransom, Donna Martin, Greg Lillmars, Heather Griffin, Kelly Crowther, Rana Rasteh, Rose Dederick, Stuart Foster, Wayne Elmore
Job Address: 2112 RIDGE PLAZA CASTLE ROCK, CO 80108
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drywall 04/18/2018 Cancelled Kerry Keller Cancelled by IVR User.  
Drywall 05/16/2018 Approved Kerry Keller  
Drywall Partial 04/10/2018 Approved Kerry Keller kitchen only  
Drywall Partial 04/20/2018 Approved Kerry Keller Ok on upper floor. Still need BSMT  
Drywall Partial 05/11/2018 Approved Kerry Keller Ok on larage room BSMT  
Electric Service Equipment 04/02/2018 Approved Rick Sugar  
Final Building 07/31/2018 Approved Clayton Rodeback  
Final Electric 07/25/2018 Disapproved Henry VanSchaack 1) pendant light not permitted within 3' hor and 8' vert of tub rim; 2) led recess not permitted within 6" hor of shelf space; 3) secure flex within 12" of wall oven j-box; 4) open j-box at bottom of stairs  
Final Electric 07/27/2018 Approved Henry VanSchaack master closet shelf reduced to 12" for clearance and master bath pendant replaces with surface disc light  
Insulation Thermal 04/05/2018 Approved Kerry Keller  
Interior Gas Line 04/02/2018 Disapproved Kerry Keller Complete all gas lines  
Interior Gas Line 04/06/2018 Cancelled Kerry Keller res  
Rough Electric 03/29/2018 Disapproved Rick Sugar See scanned ticket  
Rough Electric 04/02/2018 Approved Rick Sugar  
Rough Frame 04/02/2018 Disapproved Kerry Keller 1) Need H2o shut off at pot filler
2) S-trap at Bibet drain
3) Need mixing valve master tub
4) Need Tempered glass at master tub windows
 
Rough Frame 04/05/2018 Approved Kerry Keller Need tempered glass by final  
Rough HVAC 04/02/2018 Approved Kerry Keller  
Rough Plumbing 04/02/2018 Approved Kerry Keller see rough frame for corrections  
Shower Pan 04/12/2018 Approved Kerry Keller