Building Permit Details
Permit Number: 16-15042
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 11/02/2016
CO Issue Date: 05/23/2017
Plans Examiner: Anthony Petty, Daniel Davis, Dave Ransom, Donna Martin, Greg Lillmars, Leonard Lucero, Linda Lee, Noni Furlano, Patricia Roach, Rana Rasteh, Rose Dederick, Stuart Foster, Wayne Elmore
Job Address: 6176 TORREY PINES DR LARKSPUR, CO 80118
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 02/01/2017
Steel Letter 02/01/2017
Survey 02/02/2017
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 11/09/2016 Approved Rick Sugar IREA 11/10/2016
Drip Edge 02/21/2017 Approved Kerry Keller  
Driveway Form 05/03/2017 Approved Jill Welle
Driveway Preliminary 09/20/2016 Approved Jill Welle
Drywall 03/01/2017 Approved Kerry Keller  
Electric Service Equipment 02/02/2017 Disapproved Rick Sugar Rough elect inspection req'd
Feeder ECG must be identified in the panel and pedestal
GEC reeq'd at the copper pipe
 
Electric Service Equipment 02/08/2017 Cancelled Rick Sugar BY Deb  
Electric Service Equipment 02/09/2017 Disapproved Rick Sugar Cannot approve until rough elect. has been approved
NOTE all ESE has benn inspected
 
Electric Service Equipment 02/14/2017 Approved Rick Sugar IREA 02/15/2017
Electric Trench 12/01/2016 Approved Rick Sugar  
Exterior Lath 02/21/2017 Approved Kerry Keller  
Exterior Sheathing 02/03/2017 Disapproved Kerry Keller 1) Need eng.letter on 1 1/2'' staple used code calls for 1 3/4'' min. see table R602.3 (2)
2)Block and nail all seams at required sways
 
Exterior Wall Sheathing 02/09/2017 Approved Kerry Keller  
Final Building 05/15/2017 Disapproved Clayton Rodeback No access House locked up  
Final Building 05/16/2017 Approved Clayton Rodeback  
Final Defensible Space 05/11/2017 Approved Jill Welle
Final Driveway 05/11/2017 Approved Jill Welle
Final Electric 05/08/2017 Disapproved Rick Sugar Sacnned ticket  
Final Electric 05/11/2017 Disapproved Jim Dorsey doors locked 2;15 pm  
Final Electric 05/12/2017 Approved Rick Sugar  
Final Energy Compliance 05/15/2017 Disapproved Clayton Rodeback Locked up  
Final Energy Compliance 05/16/2017 Approved Clayton Rodeback  
Final HVAC 05/15/2017 Disapproved Clayton Rodeback locked up no access  
Final HVAC 05/16/2017 Approved Clayton Rodeback  
Final Plumbing 05/16/2017 Approved Clayton Rodeback  
Insulation Thermal 02/21/2017 Approved Kerry Keller  
Interior Gas Line 02/02/2017 Approved Kerry Keller 1 1/4''main,cook top,BBQ, FP-1,1- H2o,Fur-1
Black Hills Energy 02/03/2017
Interior Gas Line 02/08/2017 Cancelled Kerry Keller passed 2/2/2017  
Moisture Barrier 02/21/2017 Disapproved Kerry Keller 1) Need to install weep screeds at bottom terminations
2) Need to install roll lock flashing top stone to stucco
 
Moisture Barrier 03/01/2017 Approved Kerry Keller  
Preliminary Defensible Space 09/20/2016 Approved Jill Welle final inspection required
Roof Truss 02/03/2017 Approved Kerry Keller Need truss fix on T-11
Need truss bracing on T-29,T-30
Will check on rough frame insp.
 
Rough Electric 02/03/2017 Disapproved Rick Sugar Roof not dried in
Window not installed
 
Rough Electric 02/08/2017 Disapproved Rick Sugar Scanned ticket  
Rough Electric 02/08/2017 Cancelled Rick Sugar By Deb  
Rough Electric 02/09/2017 Disapproved Rick Sugar Not ready  
Rough Electric 02/14/2017 Approved Rick Sugar  
Rough Energy Compliance 02/07/2017 Cancelled Kerry Keller from office  
Rough Energy Compliance 02/09/2017 Approved Kerry Keller  
Rough Frame 02/07/2017 Cancelled Kerry Keller from office  
Rough Frame 02/08/2017 Approved Kerry Keller  
Rough HVAC 02/07/2017 Cancelled Kerry Keller from office  
Rough HVAC 02/08/2017 Approved Kerry Keller  
Rough Plumbing 02/07/2017 Cancelled Kerry Keller from office  
Rough Plumbing 02/08/2017 Approved Kerry Keller  
Ufer Ground Electrode 02/01/2017 Approved Wayne Elmore engineer letter  
Underground Plumbing 11/17/2016 Approved Kerry Keller  
Weather Resistive Barrier 02/21/2017 Approved Kerry Keller