Building Permit Details
Permit Number: 16-10409
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Basement
Scope of Work: Alteration
Issued Date: 08/01/2016
CO Issue Date:
Plans Examiner: Anthony Petty, Daniel Davis, Dave Ransom, Donna Martin, Greg Lillmars, Leonard Lucero, Linda Lee, Noni Furlano, Patricia Roach, Rana Rasteh, Rose Dederick, Stuart Foster, Wayne Elmore
Job Address: 5542 ABBEYWOOD CIR HIGHLANDS RANCH, CO 80130
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drywall 10/16/2017 Approved Robert Stratton  
Final Building 12/20/2017 Approved Robert Stratton  
Final Electric 12/20/2017 Disapproved Matt Mazzara 1)Add contractors to permit
2)CO det req upstairs
3)Smokes req combo AFCI
4)Washer req AFCI/GFCI
 
Final Electric 12/21/2017 Approved Matt Mazzara  
Interior Gas Line 09/09/2016 Disapproved Chris Fuller no answer 10:15 am  
Interior Gas Line 09/20/2016 Cancelled Chris Fuller n/a  
Interior Gas Line 09/27/2016 Cancelled Chris Fuller n/a  
Interior Gas Line 09/28/2016 Cancelled Rick Chadwick NOT NEEDED  
Rough Electric 09/09/2016 Disapproved Rick Sugar By homeowner  
Rough Electric 09/20/2016 Disapproved Rick Sugar No moer than 10 openings on a 15 amp circuit
Speaker wire must be listed
Bath exhaust not installed
NMB not in a listed box, corner of bath
 
Rough Electric 09/27/2016 Approved Rick Sugar  
Rough Electric 09/28/2016 Cancelled Rick Sugar ALREADY PASSED.  
Rough Electric 10/03/2017 Approved Matt Mazzara  
Rough Frame 09/09/2016 Disapproved Chris Fuller No answer 10:15 a.m.  
Rough Frame 09/20/2016 Disapproved Chris Fuller 1. Complete Rough-in plumbing.
2. Water heater access needs to be 30 inches in front of tank.
3. Remove all float blocks
4. Foam seal around all extr. Elec. boxes.
5. 100 sq. inch Return Air needed by Final Insp.
 
Rough Frame 09/27/2016 Disapproved Chris Fuller 1. Complete fireblocking in soffit areas.
2. Complete all Rough-in Plumbing.
3. Shower drain will need a "P trap" and we will need to insp. it before covering up.
 
Rough Frame 09/29/2016 Approved Chris Fuller corrections made  
Rough Frame 10/03/2017 Approved Robert Stratton  
Underground Plumbing 08/11/2017 Disapproved Chris Fuller Submit changes to County on changes to original approved plans.