Building Permit Details
Permit Number: 14-05268
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Duplex
Scope of Work: New
Issued Date: 01/27/2015
CO Issue Date: 10/23/2015
Plans Examiner: Angie Velasquez, Anthony Petty, Bridget Rassbach, Daniel Davis, Dave Ransom, Greg Lillmars, Leonard Lucero, Martha Mahr, Patricia Roach, Rose Dederick
Job Address: 5167 LE DUC DR CASTLE ROCK, CO 80108
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 07/17/2015
Steel Letter 07/17/2015
Survey 07/20/2015
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drywall 08/12/2015 Approved Clayton Rodeback  
Electric Service Equipment 07/21/2015 Disapproved Rich Edgett 1) Move panel out to be flush with drywall
2) Plastic bushing required on nipple in panel
3) UFER GEC msut be 4 AWG
4) Intersystem bonding conductor must be 6 AWG
5) Furnace not wired
 
Electric Service Equipment 07/27/2015 Approved Rich Edgett IREA 07/28/2015
Exterior Lath 08/07/2015 Approved Clayton Rodeback  
Exterior Wall Sheathing 05/26/2015 Approved Chris Fuller  
Final Building 10/19/2015 Disapproved Kerry Keller 1) Provide House Numbers
2) Paint gas lines
3) Complete Attic Access garage
4 Concrete around floor drain
 
Final Building 10/20/2015 Approved Kerry Keller  
Final Electric 10/20/2015 Disapproved Rich Edgett Scanned Ticket  
Final Electric 10/20/2015 Cancelled Rich Edgett Fire Dept Approval Required  
Final Electric 10/22/2015 Approved Rich Edgett  
Final Electric 10/22/2015 Cancelled Rich Edgett Per Mike  
Final Energy Compliance 10/19/2015 Approved Kerry Keller  
Final Energy Compliance 10/19/2015 Cancelled Kerry Keller passed  
Final HVAC 10/19/2015 Approved Kerry Keller  
Final Plumbing 10/19/2015 Approved Kerry Keller  
Firewall 05/26/2015 Approved Chris Fuller  
Insulation Thermal 07/30/2015 Approved Brian Brown  
Interior Gas Line 07/21/2015 Disapproved Kerry Keller No Test  
Interior Gas Line 07/27/2015 Approved Brian Brown Black Hills Energy 07/28/2015
Midroof 10/15/2015 Approved Rich Garrett  
Moisture Barrier 09/15/2015 Approved Kerry Keller  
Roof Truss 07/21/2015 Disapproved Kerry Keller 1) Need truss fix on A21 Truss
2)Missing truss brace on A02 truss
 
Roof Truss 07/27/2015 Approved Brian Brown  
Rough Electric 07/21/2015 Disapproved Rich Edgett Scanned Ticket  
Rough Electric 07/27/2015 Approved Rich Edgett 1) Strap top of furnace flex
2) Bond telecom panel
Will check at Final
 
Rough Energy Compliance 07/21/2015 Approved Kerry Keller  
Rough Frame 07/21/2015 Disapproved Kerry Keller NO plumbing on test
no fire dept. rough
not ready
 
Rough Frame 07/27/2015 Approved Brian Brown  
Rough Frame Partial 06/17/2015 Disapproved Kerry Keller Open UP columns soto insp.
provide truss and plans for insp.
 
Rough Frame Partial 06/18/2015 Approved Kerry Keller Columns only  
Rough HVAC 07/21/2015 Cancelled Kerry Keller  
Rough HVAC 07/27/2015 Approved Brian Brown  
Rough Plumbing 07/21/2015 Disapproved Kerry Keller No Tests  
Rough Plumbing 07/27/2015 Approved Brian Brown  
Shower Pan 08/25/2015 Approved Kerry Keller  
Special Inspection 08/25/2015 Approved David Lewis  
Ufer Ground Electrode 07/17/2015 Approved Greg Lillmars By Engineering Letter.  
Underground Plumbing 04/09/2015 Approved Kerry Keller  
Weather Resistive Barrier 06/17/2015 Approved Kerry Keller