Building Permit Details
Permit Number: 14-05262
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Stock
Scope of Work: New
Issued Date: 08/11/2014
CO Issue Date: 05/06/2015
Plans Examiner: Angie Velasquez, Anthony Petty, Bridget Rassbach, Daniel Davis, Dave Ransom, Greg Lillmars, Leonard Lucero, Martha Mahr, Patricia Roach, Rose Dederick
Job Address: 5048 MCCLURE LN CASTLE ROCK, CO 80108
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 01/26/2015
Steel Letter 01/26/2015
Survey 08/28/2014
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 08/15/2014 Approved Rich Edgett IREA 08/18/2014
Drip Edge 04/01/2015 Approved Kerry Keller  
Drywall 02/11/2015 Approved Kerry Keller  
Electric Service Equipment 12/22/2014 Cancelled Rich Edgett Rough Electric Required  
Electric Service Equipment 01/28/2015 Approved Rich Edgett NOTES:
a) UFER in garage north wall
b) 6 AWG SER in thermal insulation rated 40A at 60deg c
IREA 01/29/2015
Exterior Lath 02/11/2015 Approved Kerry Keller  
Exterior Wall Sheathing 11/14/2014 Approved Clayton Rodeback  
Final Building 05/04/2015 Disapproved Kerry Keller RES See file  
Final Building 05/05/2015 Approved Kerry Keller  
Final Electric 05/04/2015 Disapproved Rich Edgett Scanned ticket  
Final Electric 05/05/2015 Approved Rich Edgett  
Final Energy Compliance 05/04/2015 Disapproved Kerry Keller 1) Provide paper work at Mech. room  
Final Energy Compliance 05/05/2015 Approved Kerry Keller  
Final Grade 05/06/2015 Approved UnassignedDESC Jared Tanaka, Securities where posted copy of check in scanning.
Final HVAC 05/04/2015 Approved Kerry Keller  
Final HVAC 05/06/2015 Cancelled Kerry Keller passed 5/4/15  
Final Plumbing 05/04/2015 Approved Kerry Keller  
Final Plumbing 05/06/2015 Cancelled Kerry Keller passed 5/4/15  
Insulation Thermal 02/02/2015 Approved Kerry Keller  
Interior Gas Line 12/16/2014 Approved Kerry Keller Black Hills Energy 12/17/2014
Midroof 03/09/2015 Disapproved Kerry Keller 1) Need to install a fastener in every roof tile  
Midroof 03/31/2015 Disapproved Kerry Keller No Ladder Provider  
Midroof 04/01/2015 Approved Kerry Keller  
Moisture Barrier 03/16/2015 Approved Rick Chadwick  
Preliminary DESC 08/11/2014 Cancelled UnassignedDESC
Preliminary Defensible Space 07/18/2014 Approved Jill Welle
Roof Truss 11/26/2014 Approved Kerry Keller  
Rough Electric 01/27/2015 Disapproved Rich Edgett Scanned Ticket  
Rough Electric 01/28/2015 Disapproved Rich Edgett 1) Items from prev insp not done: 3, 8, & 10
2) New wall framed in garage: Is there to be a seperate switch for the storeroom light??
OK to insulate pending Frame approval
 
Rough Electric 01/29/2015 Approved Rich Edgett  
Rough Energy Compliance 01/29/2015 Approved Kerry Keller  
Rough Frame 01/28/2015 Disapproved Kerry Keller 1) Need to provide 12'' clearance on can lights to plex piping or insulate plex piping
2)missing anchor boltleft side of BSMT door max 8'' from opening
call Rouhg Energy insp.
 
Rough Frame 01/28/2015 Cancelled Kerry Keller  
Rough Frame 01/29/2015 Approved Kerry Keller  
Rough Frame Partial 11/18/2014 Approved Clayton Rodeback  
Rough HVAC 01/28/2015 Approved Kerry Keller  
Rough Plumbing 01/28/2015 Approved Kerry Keller  
Shower Pan 03/09/2015 Approved Kerry Keller  
Underground Plumbing 08/28/2014 Approved Kerry Keller  
Weather Resistive Barrier 12/01/2014 Approved Kerry Keller  
Weather Resistive Barrier 12/02/2014 Cancelled Kerry Keller