Building Permit Details
Permit Number: 14-02491
Permit Status: Completed
Permit Type: Building
Project Type: Residential
Description of Work: RS - Custom
Scope of Work: New
Issued Date: 09/30/2014
CO Issue Date: 12/24/2019
Plans Examiner: Angie Velasquez, Anthony Petty, Bridget Rassbach, Daniel Davis, Dave Ransom, Greg Lillmars, Leonard Lucero, Martha Mahr, Patricia Roach, Rose Dederick
Job Address: 10010 S PERRY PARK RD LARKSPUR, CO 80118
Building Code: 2012 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 01/02/2018
Steel Letter 02/09/2018
Survey 09/22/2017
Survey 12/27/2017
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Construction Meter 07/02/2015 Disapproved Rich Edgett See Electric Service Equipment Partial  
Construction Meter 07/15/2015 Approved Rich Edgett  
Drywall 04/13/2018 Disapproved Kerry Keller 1) Wrong screws used on Durock must be approved fasteners per durock spec's
ok to tape and mud
Recall drywall with shower pan insp.
 
Drywall 05/14/2018 Approved Kerry Keller  
Drywall 06/14/2019 Cancelled Kerry Keller dup insp.  
Electric Service Equipment 01/11/2018 Disapproved Rick Sugar Allow clearance above the elevator elect. panel
Ufer must be accessible in the mech room
Need to inspect elevator termination when complete
 
Electric Service Equipment 06/28/2019 Approved Rick Sugar IREA 07/01/2019
Electric Service Equipment Partial 07/02/2015 Disapproved Rich Edgett 1) Meter housing must be below 6' to center
2) Bonding bushing required on offset nipple ahead of disconnect
3) Meter jumpers no longer permitted in temps (connect feeder conductors directly to buss terminals
4) Tape is not approved for seal-tight repair (use rubber tape OR heat shrink)
5) Re-set temp after grade is corrected for #1
 
Electric Service Equipment Partial 07/15/2015 Approved Rich Edgett Main disconnect at garage ONLY IREA 07/16/2015
Electric Trench Partial 02/24/2016 Approved Rich Edgett 3", 2", & 1-1/4" PVC vertically at elev shaft exterior  
Electric Trench Partial 08/01/2016 Approved Rich Edgett 3", 2", & 1-1/4" PVC from elev shaft to north foundation wall
NO access to permit card
 
Electric Trench Partial 08/29/2016 Approved Rick Sugar PVC basement floor to the elevator shaft  
Electric Trench Partial 09/14/2016 Approved Rick Sugar  
Electric Trench Partial 05/25/2018 Approved Jim Dorsey 2-3/4' to tanks back of house  
Exterior Lath 12/15/2017 Approved Kerry Keller  
Exterior Lath 02/09/2018 Cancelled UnassignedBldg wrong inspection  
Exterior Lath 02/12/2018 Disapproved Kerry Keller see moisture barrier inspection  
Exterior Underground Gas Line 05/22/2018 Approved Kerry Keller  
Exterior Wall Sheathing 04/14/2017 Approved Kerry Keller  
Final Building 06/28/2019 Disapproved Kerry Keller Need Elevator completed and Final Inspection
OK for T.C.O. 90 Day's
 
Final Defensible Space 06/28/2019 Approved Steve Dwyer  
Final Driveway 06/28/2019 Approved Steve Dwyer
Final Electric 06/21/2019 Disapproved Rick Sugar See scanned ticket  
Final Electric 06/24/2019 Cancelled UnassignedBldg Cancelled by Web user.  
Final Electric 06/25/2019 Disapproved Rick Sugar Breakers #8 in main panel and breakers #1,#11,#16 tripping not staying on
Open generator dead front and exterior to inspect
Breaker fillers at exterior panel
Dead front on exterior panel missing
Provide load calculation
 
Final Electric 06/27/2019 Disapproved Rick Sugar Need for to sign permit card for the garage, under different permit #
Electrical inspection not complete; on service equipment
 
Final Electric 06/28/2019 Approved Rick Sugar  
Final Electric 09/12/2019 Approved Rick Sugar Inspection for the elevator terminations  
Final Energy Compliance 06/28/2019 Approved Kerry Keller  
Foundation Insulation 11/12/2014 Approved Clayton Rodeback  
Insulation Thermal 03/27/2018 Approved Kerry Keller  
Interior Gas Line 02/13/2018 Cancelled Kerry Keller res  
Interior Gas Line 02/28/2018 Approved Clayton Rodeback  
Moisture Barrier 12/15/2017 Disapproved Kerry Keller Still need elev. shaft M.B. inspection  
Moisture Barrier 12/21/2017 Cancelled Kerry Keller cancelled by builder super Brian  
Moisture Barrier 02/12/2018 Disapproved Kerry Keller 1) Maintain your 7'' O.C. Vert. with tap cons and wind locks washers
2) Provide wind locks washers on all tap cons
 
Preliminary DESC 09/30/2014 Cancelled UnassignedDESC
Preliminary Defensible Space 04/23/2014 Approved Jill Welle final inspection required
Roof Truss 08/25/2017 Disapproved Clayton Rodeback Strong back F01 gable.
Missing Gsset F03 bottom cord.
Missing Gusset F07 vert upright x2
XX01 Girder missing 1/2' through bolts per spec or provide letter.
Provide Uplift hardware west end of end of XXO1
Provide layout sheet.
 
Roof Truss 09/22/2017 Approved Kerry Keller  
Rough Electric 01/11/2018 Disapproved Rick Sugar Seperate nmb cables at powder bath wall
Outlets req'd at all elevator hallways
2'-4' rule at dining counter
Install / terminate rec room floor outlet
3 wire req'd at all ceiling fans
Reduce bundling at master walk in closet
NOTE need to inspect the elevator room
 
Rough Electric 02/13/2018 Approved Rick Sugar Need to inspect eleevator room (no access)
Fire suppression not complete
Need permit card on job site
 
Rough Electric 12/18/2018 Approved Rick Sugar Elevator room and lobby  
Rough Energy Compliance 03/09/2018 Cancelled Kerry Keller will do at insulation insp.  
Rough Energy Compliance 03/27/2018 Approved Kerry Keller  
Rough Frame 02/13/2018 Cancelled Kerry Keller res  
Rough Frame 02/28/2018 Disapproved Clayton Rodeback Scan  
Rough Frame 03/08/2018 Approved Kerry Keller  
Rough Frame Partial 04/14/2017 Approved Kerry Keller partial on decks and columns only  
Rough Frame Partial 09/22/2017 Approved Kerry Keller Ok on upper roof at out door living ceiling
appears to be installed Per Entech Eng.plan and letter.
 
Rough HVAC 03/08/2018 Approved Clayton Rodeback  
Rough Plumbing 03/08/2018 Approved Clayton Rodeback  
Shower Pan 05/14/2018 Disapproved Kerry Keller Ok on upper floor 2 pans  
Shower Pan 08/09/2018 Approved Kerry Keller  
Special Inspection 07/18/2018 Approved Kerry Keller Consultation on Guardrail exterior  
Ufer Ground Electrode 01/29/2018 Approved Rick Sugar Engineer letter scanned  
Underground Plumbing 08/02/2016 Disapproved Kerry Keller 1) low test
2) Need to vent floor drain
Provide permit and approved plans
 
Underground Plumbing Partial 11/25/2014 Approved Kerry Keller Okay on west end of house only  
Underground Plumbing Partial 08/05/2016 Approved Kerry Keller Ok on Main house U.G.
Need inspection on U.G. BETWEEN Foundations