Building Permit Details
Permit Number: 11-05714
Permit Status: Completed
Permit Type: Building
Project Type: Accessory Use
Description of Work: AU - Garage
Scope of Work: New
Issued Date: 11/01/2011
CO Issue Date:
Plans Examiner: Dave Ransom
Job Address: 2590 ANNIES PL CASTLE ROCK, CO 80104
Building Code: 2006 IRC
Scheduled Inspections
Name Date Scheduled Estimated Time of Inspection
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters Received Date
Caisson/Footer/WG Letter 03/05/2012
Survey 03/02/2012
Inspection History
Name Date Occurred Result Inspector Name Inspection Comments Meter Release Inspection Report
Drip Edge 01/03/2012 Approved Kerry Keller  
Drywall 03/21/2012 Approved Kerry Keller  
Electric Service Equipment 03/08/2012 Disapproved Greg Lillmars 1. #2 aluminum is 90 amps per table 310.16 , 75 degree column, what breaker is on the line size ?
Wiring OK
 
Electric Trench 03/08/2012 Approved Greg Lillmars trench ok wayne PVC PIPE to building  
Exterior Lath 02/17/2012 Disapproved Rich Garrett res  
Exterior Lath 02/28/2012 Approved Kerry Keller  
Exterior Wall Sheathing 01/03/2012 Approved Kerry Keller  
Final Building 07/02/2012 Approved Kerry Keller  
Final Defensible Space 05/16/2012 Disapproved Jill Welle res
Final Defensible Space 06/28/2012 Approved Jill Welle
Final Electric 07/02/2012 Approved Greg Lillmars A 70 amp main breaker for the garage was installed in the main panel.  
Final Grade 05/04/2012 Disapproved Jerry Dortch See ticket.
Final Grade 05/09/2012 Approved Jerry Dortch Need DESC Deactivation Cert.
Final Plumbing 07/02/2012 Approved Kerry Keller  
Insulation Thermal 03/13/2012 Approved Kerry Keller  
Moisture Barrier 02/17/2012 Disapproved Rich Garrett res  
Moisture Barrier 02/28/2012 Cancelled Kerry Keller  
Moisture Barrier 04/10/2012 Disapproved Kerry Keller 1= Provide manufacturer installation for stone to be used  
Moisture Barrier 04/13/2012 Disapproved Kerry Keller 1= corrections not made  
Moisture Barrier 04/18/2012 Approved Kerry Keller  
Preliminary DESC 01/03/2012 Approved Jerry Dortch
Preliminary Defensible Space 09/30/2011 Approved Jill Welle final inspection required
Roof Truss 01/03/2012 Approved Kerry Keller  
Rough Electric 03/06/2012 Approved Wayne Elmore need servicevand trench inspection  
Rough Frame 03/06/2012 Disapproved Kerry Keller 1= Wrong joist hangars used per eng. plans
2= Wrong DBL hangars used per eng. plans
3=Provide new eng. plan showing all window changed or added
4=Need eng. on rear loft ledger bolted to foundation wall
5= Need plans up dated for bath room added
6=Complete EX. fan duct work
7=Need tempered glass @ sliding window top of stair
8=How are you protecting H20 piping from freezing bath room
 
Rough Frame 03/09/2012 Approved Kerry Keller  
Rough HVAC 03/09/2012 Approved Kerry Keller  
Rough Plumbing 03/09/2012 Approved Kerry Keller  
Underground Plumbing 02/13/2012 Approved Kerry Keller