Building Permit Details
Permit Number:
26-00248
Permit Status:
Issued
Permit Type:
Building
Project Type:
Commercial
Description of Work:
CM - Commercial
Scope of Work:
New
Issued Date:
03/25/2026
CO Issue Date:
Plans Examiner:
Christopher Polanski, Justin Lett
Job Address:
6505 PINERY CENTER BLVD PARKER, CO 80134
Building Code:
2021 IBC
Inspections
Contractors
Permit Fees
Property Details
Structure Details
Documents
JavaScript and Session Cookies must be enabled for this Site.
Scheduled Inspections
Name
Date Scheduled
Estimated Time of Inspection
Underground Plumbing Partial
06/01/2026
12:00 - 2:00
Engineering Letters
Engineering Letters will be listed below if they are required for your project. They must be submitted before scheduling above ground inspections.
Required Engineering Letters
Received Date
Caisson/Footer/WG Letter
Steel Letter
Survey
Inspection History
Name
Date Occurred
Result
Inspector Name
Inspection Comments
Meter Release
Inspection Report
Foundation Insulation
05/26/2026
Disapproved
Dusty Welz
Sheet SP.1.0 pink highlighter. Foundation insulation has been approved on south, west and north elevations. Left open until least wall is complete. Please have a copy of the county approved structural drawings on site. Today is a partial approval for the north facing elevation only. Please only schedule partials until completed.
Print Report
Foundation Insulation
05/27/2026
Approved
Fredrick Mooney
Print Report
Foundation Insulation Partial
05/22/2026
Approved
Fredrick Mooney
South and west elevations only
Print Report
Slab Electrical
05/27/2026
Approved
Nathan Waldschmidt
Reception desk to demising wall.
Print Report
Slab Electrical Partial
05/29/2026
Approved
Nathan Waldschmidt
(2) 4” from main disconnect to inside MDP
(3) 3/4”, (2) 1” from electrical room stubbed outside.
(2) 3” from phone closet stubbed outside.
Print Report
Ufer Ground Electrode
05/27/2026
Approved
Nathan Waldschmidt
20’ rebar covered with 4” of concrete
Print Report
Underground Plumbing
05/29/2026
Approved
Fredrick Mooney
Print Report
Underground Plumbing Partial
05/28/2026
Disapproved
Robert Stratton
1. Exterior plumbing tie in on north east corner of building approved and is OK to backfill.